Specification guidance for construction
When writing architectural specifications getting the basics in place from the start will help you build a document suitable to your needs. Listed below are some basic rules to follow when writing your next specification:
- Always edit your specification to reflect your appointment and the selected procurement route.
- Always start from a solid baseline document. Do not take the last project you prepared a specification for and change the headers and footers. No matter how vigilant you are, mistakes such as naming the wrong project, specifying incorrect materials and other basic errors will creep into your documents.
- Avoid using the term 'or similar approved' in a specification. If you approve it you are assuming liability for it. Instead use the term ‘or acceptable equivalent’. By accepting an alternative the responsibility for Fitness for Purpose moves to the contractor and the architect's acceptance is for design intent only. If the architect approves, they take back that responsibility. Normally, alternatives are offered for program or cost reasons and the contractor is responsible for the fact that they are providing a different product that must be at least as good quality-wise as the one specified by the architect. If the architect is specifying by description only, the contractor is obliged to provide the technical solution which again they have to be responsible for in terms of quality, performance, appearance and fitness for purpose.
- The proper use of defined terms is important in a specification. Check your contract.
- Document/section identification should appear on every page in the footer for document control purposes.
- Avoid putting specification clause numbers on your drawings. The use of product reference codes is recommended which should all be included on a technical reference sheet (T-Sheet) that links the drawings and the specification. This makes life much easier when changes are required.
- Avoid mixing prescriptive and performance specifications, that is, don’t name a very specific product and then provide performance characteristics for that product – this is not necessary and creates the potential for conflict resulting in claims.
- Avoid specifying temporary works – this is the contractor’s responsibility. Just specify the need to protect adequately, not how to do it.
- Remove names of individuals when specifying products and just provide the company’s details.
- Remove unfinished clauses and terms such as 'if required'. If you are specifying a specific technical solution then you have to specify everything.
- Do not highlight particular clauses by using bold or underlining, as this indicates that the clause is of special importance and there is no such thing in a specification, as by default it indicates that everything else is not so important.
- Always allow time to have your specifications proof-read.
[edit] Related articles on Designing Buildings Wiki
- Bill of quantities.
- Common Arrangement of Work Sections (CAWS).
- Comparison of SMM7 with NRM2.
- Final specifications.
- Insulation specification.
- New Rules of Measurement (NRM)
- Output-based specification.
- Outline specification.
- Performance specification.
- Prescriptive specification.
- Procurement.
- Specification.
- Standard Method of Measurement (SMM7).
- Tender documentation.
- What should be included in a scope of work?
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.